Windang Bridge Project
Windang Bridge Project
Transport for NSW engaged Boab Commercial Marine to place rock around the pylons of Windang Bridge, protecting the foundations against tidal scour at the entrance to Lake Illawarra.
Dates
July 2024 to September 2026, about 2 years
Scope
Rock placement for scour protection; vessel and punt operations at the pylons; design and fabrication of hydraulic tipper bins; dredging under bridge to provide even footings
Client
Transport for NSW
Staff
Skippers and deckhands
Vessels
Thunderbolt, Sunny, Daisy, barges, dredge, work punts
Location
Windang Bridge, Lake Illawarra entrance, NSW
Challenges
Strong tidal flow through the channel; accurate placement while holding station; plant that did not exist off the shelf